Hermann Dr. from Jackson St. west to Main St.
Storm Sewer Consolidated Construction Fund with 75% participation with FEMA
Complete
The project was awarded to the General Contractor on June 22, 2005.
General Contractor: Texas Sterling Construction L.P.
COH Construction Project Manager: Jamil Chunawala
SWMP Design Engineer: PGAL
Construction is complete.
The project consisted of a 12-foot by 10-foot reinforced concrete box storm sewer from 600 feet east of Jackson to the Mecom Fountain. The storm sewer continues around the perimeter of the fountain to connect to existing storm sewers along Main and Montrose Blvd. The storm sewer improvements will also include associated inlets, inlet leads, and laterals. The roadway pavement was reconstructed full width concrete with curb and gutter. The pavement along Hermann is four-lane undivided section.
Last Updated 5/5/2009