Almeda Rd. from Brays Bayou north up to Hermann Dr. then along Hermann to Jackson St.
Storm Sewer Consolidated Construction Fund with 75% participation with FEMA
Complete
The project was awarded to the General Contractor on November 18, 2004.
General Contractor: Texas Sterling Construction LP
COH Construction PM: Joanne Kamman
SWMP Design Engr: Claunch & Miller
Construction is complete.
The project consisted of the construction of a 12-ft X 10-ft reinforced concrete box storm sewer from the Almeda Bridge at Brays Bayou, north along Almeda to Hermann, and west along Hermann to 600-ft east of Jackson. The storm sewer improvements included associated inlets, inlet leads, and laterals. The roadway pavement was reconstructed full width concrete with curb and gutter. The pavement along Hermann is four-lane undivided section. The pavement along Almeda is four-lane undivided section with continuous left-turn lane. A new 48-inch waterline was constructed in conjunction with this project as part of the City’s Surface Water Transmission Program.
Last Updated 2/25/2008