Kirkwood Dr (Briar Forest) Drainage Improvements

Under Engineering Design
SWMP Design Engr: United Engineers Inc.
Constr Award: FY2011
Constr Est: $6,326,000
CIP No.: M-0250

 

What's Happening?

70% Submittal scheduled for 08-12-10.

50% Submittal received on 03-22-10.


Project Description

The proposed drainage improvements consist on removal and replacement of several undersized inlets; inclusion of several inlets on grade to intercept gutter flows from large/oversized drainage areas; replacement of several undersized storm sewer lines; removal and replacement of pavement and sidewalk where needed in order to install the proposed inlets, inlet leads, manholes and storm sewer; water line and sanitary sewer replacement when in conflict with the new the proposed storm sewer.

Last Updated 6/3/2010