The project area is generally bound by Underwood St on the north, Brays Bayou on the south, Edloe St on the west, and Buffalo Speedway on the east. The project is located on Key Map 532K.
Complete
The project was awarded to the General Contractor on June 6, 2007.
General Contractor: Texas Sterling LP
COH Constr PM: Jeff Chukwu
SWMP Design Engr: AECOM
Constr Contract: $10,745,899
CIP No.: M-0253-1
Final inspection held on 08-28-09.
Substantial completion inspection held on 04-30-09.
The project consists of the construction of approx. 13,962-linear ft of 24-in thru 72-in diameter reinforced concrete storm pipe, 1,545-linear ft of 10-in and 12-in diameter sanitary sewer rehabilitation, 23,829-linear ft of 6-in thru 8-in diameter water line, concrete roadway reconstruction with curb and gutter, and sidewalks.