Edloe St (N Braeswood to Underwood) Storm Sewer Relief Segment 1

Complete
The project was awarded to the General Contractor on June 6, 2007.

General Contractor: Texas Sterling LP
COH Constr PM: Jeff Chukwu
SWMP Design Engr: AECOM
Constr Contract: $10,745,899
CIP No.: M-0253-1

 

What's Happening?

Final inspection held on 08-28-09.

Substantial completion inspection held on 04-30-09.



Project Description

The project consists of the construction of approx. 13,962-linear ft of 24-in thru 72-in diameter reinforced concrete storm pipe, 1,545-linear ft of 10-in and 12-in diameter sanitary sewer rehabilitation, 23,829-linear ft of 6-in thru 8-in diameter water line, concrete roadway reconstruction with curb and gutter, and sidewalks.

Last Updated 12/18/2009