This project is generally bounded by I-10 on the North, Memorial Dr. on the South, Wycliffe Dr. on the West and W Sam Houston Tollway N on the East. The project is located on Key Map 489C, 489G.
Complete
General Contractor: SER Construction
Constr Est: $4,295,546
COH Construction Project Manager: Joanne Kamman
SWMP Design Engr: Van De Wiele Engineering Inc.
Constr Award: FY2009
CIP No.: M-0249
Construction start date 06-29-2009 and it should be completed within 500 calendar days.
Inspection held on 07-30-10.
This project consists of approximately 8,993 linear feet of 12-inch, 8-inch 6-inch, 4-inch, 3-inch and 2-inch water lines, 8,116 linear feet of 60-inch, 54-inch, 48-inch, 42-inch, 36-inch, 30-inch, and 24-inch storm sewer, 801 linear feet of 16-inch, 12-inch, and 8-inch sanitary sewer rehabilitation and concrete roadway reconstruction with curb and gutter.
Last Updated 8/3/2010