The project area is within drainage area D0687 of the Comprehensive Drainage Plan. The project area is generally bounded by Harwin to the north, Brays Bayou to the south, Baynard to the east, and Wildacres to the west.
Under Engineering Design
SWMP Design Engr: SES Horizon
Constr Award: FY2011
Constr Est: $7,800,000
CIP No.: M-0280
90% Submittal to be scheduled.
70% Drawings received on 11-06-09 for review.
50% Drawings received on 08-13-09 for review.
The drainage improvements consist of new storm sewer along Boone and at locations to be determined in Brays Village Patio Homes subdivision. Street reconstruction, water line, and sanitary sewer replacement will occur when the new storm sewers are installed.
Last Updated 5/24/2010