Nottingham/ Kirkwood Area Drainage Improvements (Buffalo Bayou to IH-10)

Under Engineering Design
SWMP Design Engineer: CivilTech Engineering Inc.
Construction Award: FY2012
Construction Estimate: $8,250,000
CIP No.: M-0247

 

What's Happening?

90% Final Design on hold.

Project Description

The project consists of the design of an 84-in diameter reinforced concrete storm pipe bored under Memorial to connect the new storm sewer along Kirkwood. From Kirkwood north to Kimberley a 9-ft X 7-ft reinforced concrete box storm sewer will connect to an existing 84-in diameter storm pipe from the west and transition to a 54-in diameter reinforced concrete storm pipe traveling north. A new 66-in diameter reinforced concrete storm pipe will be installed along Woodthorpe. A new 54-in diameter reinforced concrete storm pipe will be installed along Taylorcrest. New inlets will be installed at each cross street along Kirkwood. New 16-in diameter water line along Kirkwood. The roadway pavement will be reconstructed full width concrete with curb and gutter. The pavement on Kirkwood will be four-lane divided section with median including sidewalks.

Last Updated 6/26/2009