The Sherwood Forest Storm Sewer Improvement Project is generally bounded by IH-10 on the north, Silber Road on the east, Memorial Drive on the south and International Blvd. on the west. The project also consists of improvements within the Sherwood Forest Section D south of Memorial Drive along East Friar Tuck and West Friar Tuck.
Storm Sewer Consolidated Construction Fund
Under Engineering Design
SWMP Design Engineer: CLR, Inc.
Construction Award: FY2013
Construction Estimate: $5,750,000
CIP No.: M-0263
Final design on hold.
The project consists of new storm sewer infrastructure along International Blvd., Antoine Drive, Silber Road and Memorial Drive.
Last Updated 10/29/2008