The project is generally bound by Long Dr. on the north, Kingsway St. on the south, Tucker St. on the west, an dTelephone Rd. on the east. The project is located on Key Map 534R, 535S.
Storm Sewer Consolidated Construction Fund
Complete
The project was awarded to the General Contractor on June 14, 2006.
General Contractor: Pace Services L.P.
COH Construction Project Manager: Salim Ayub
SWMP Design Engineer: Jaymark Engineers
Construction Contract: $9,717,726
CIP No.: M-0228
Substantial completion inspection held on 09-29-2008.
The project consists of the construction of approx. 13,101-linear ft. of 18-in. thru 78-in diameter storm pipe, asphalt roadway reconstruction with concrete curb and gutter, 30,560-linear ft. of 8-in. thru 16-in. diameter water line replacement, and 5,193-linear ft. of sanitary sewer rehabilitation. The project is partially funded by CDBG funds.
Last Updated 6/23/2009