Kirby Drive Storm Sewer Relief Project Segment 1

Complete
The project was awarded to the General Contractor in June 23, 2004.

General Contractor: Texas Sterling Construction LP
COH Construction PM: Jeff Chukwu
SWMP Design Engineer: AECOM
Construction Contract: $12,853,471
CIP No.: M-0771-2

 

What's Happening?

Construction is complete.

Project Description

The project consists of construction of a dual 12-ft X 12-ft reinforced concrete box storm sewer from outfall at Brays Bayou to 100-ft south of Dorrington. The storm sewer improvements will also include associated inlets, inlet leads, and laterals. The inlets and inlet spacing were designed based on the 5-year design rainfall event. The roadway pavement will be reconstructed full width concrete with curb and gutter. The pavement from Brays Bayou to 100-ft south of Dorrington will be a four-lane divided section with median including sidewalks. A new 24-in diameter water line with appurtenances will be constructed along the entire project route.

Last Updated 5/5/2009