The project area is generally bounded on the north by Lindyann, on the south by W. 11th St., on the west by Seamist St. and on the east by West T.C. Jester Blvd.
Storm Sewer Consolidated Construction Fund
Complete
The project was awarded to the General Contractor on March 16, 2005.
General Contractor: D.L. Elliot Enterprises, Inc.
COH Construction Project Manager: Jim Wilson
SWMP Design Engineer: CivilTech Engineering, Inc.
Construction is complete.
This project consisted of approximately 16,360 linear feet of 8-foot by 5-foot, 7-foot by 6-foot, 6-foot by 5-foot, 6-foot by 4-foot, 5-foot by 4-foot and 5-foot by 3-foot reinforced concrete box, 60-in., 54-in., 48-in., 42-in., 36-in., 30-in., 24-in., and 18-in. storm sewers, concrete curb and gutter roadway reconstruction and waterline replacement.
The project consisted of the installation of New storm sewer trunk lines throughout the Timbergrove Manor subdivision. The storm sewer improvements will also include associated inlets, inlet leads, and laterals. Pavement reconstruction will occur only where the new storm sewer trunk line(s) will be located. There is a waterline reconstruction project slated under this design package.
Last Updated 2/15/2008