Crane-Englewood Area Drainage Improvement Project

Complete
The project was awarded to the General Contractor on June 8, 2005.

General Contractor: JFT Construction, Inc.
COH Construction Project Manager: Salim Ayub
SWMP Design Engineer: United Engineers

 

What's Happening?

Construction is complete.

Project Description

This project consisted of the installation of approximately 11,692 linear feet of reinforced concrete box storm sewer along Crane St., Collingsworth St., and Engleford St. from Majestic to the Harris County Flood Control District Ditch Unit No. H10-00-00, 8,000 linear feet of 8-in. waterline, concrete pavement with curb and gutter, and sidewalk along the storm alignment. The project also involved the removal and replacement of the sanitary sewer and regrading of the existing roadside ditches.

Last Updated 2/25/2008