This project is generally bounded by Cavalcade St. on the north, Liberty Rd. on the south, Majestic Blvd. on the east, and Lockwood Dr. on the west.
Storm Sewer Consolidated Construction Fund
Complete
The project was awarded to the General Contractor on June 8, 2005.
General Contractor: JFT Construction, Inc.
COH Construction Project Manager: Salim Ayub
SWMP Design Engineer: United Engineers
Construction is complete.
This project consisted of the installation of approximately 11,692 linear feet of reinforced concrete box storm sewer along Crane St., Collingsworth St., and Engleford St. from Majestic to the Harris County Flood Control District Ditch Unit No. H10-00-00, 8,000 linear feet of 8-in. waterline, concrete pavement with curb and gutter, and sidewalk along the storm alignment. The project also involved the removal and replacement of the sanitary sewer and regrading of the existing roadside ditches.
Last Updated 2/25/2008