The project area is generally bounded by Sims Bayou on the north, by Airport Blvd. on the south, by Mykawa Rd. on the west and by Telephone Rd. on the east.
Storm Sewer Consolidated Construction Fund
Complete
The project was awarded to the General Contractor on February 23, 2005.
General Contractor: Huff & Mitchell, Inc.
COH Construction Project Manager: Salim Ayub
SWMP Design Engineer: AECOM
Construction is complete.
This project consisted of approximately 12,340 linear feet of 60-in., 54-in., 48-in., 42-in., 36-in., 30-in., and 24-in. storm sewer. The project included partial asphalt roadway removal/reconstruction and partial asphalt overlay, driveway and culvert replacement, and roadside ditch regrades.
Last Updated 5/5/2009